PROJECTS and CLIENTS
PROJECTS and CLIENTS
a tribute to all Projects and Clients that trusted our services
Due to Personal Data Protection Act (PDPA) and Non Disclosure Agreements (NDA) we regret we are unable to publish any images of our previous jobs without prior written or expressed permission obtained from our Clients.
MARINE INCIDENT AND DAMAGE INVESTIGATION SURVEY
Northsea Inspection & Survey Sdn Bhd
On July 7, 2024, a 70 metre long cargo ship loaded with steel bound for Kuching, (East Malaysia) from Port Klang, reported engine problems and re-entered the port's waters to seek permission to anchor. In the early morning hours the ship was reported to be unstable due to bad weather and was at risk of sinking. Sekaran Technical Services was requested to send a surveyor to the site to report to the P&I on the situation. Upon its preliminary conditional survey and investigation it provided sufficent confidence to a group of specialist, together with the crew of the ship, to re-boarded the cargo ship to re-stabilise the vessel and carry out repair work by the next day to commence with their sea voyage.
PORT CAPTAIN SERVICES
dShip Carriers GmbH & Co. KG
Period
 27 April 2022 till 03 May 2022
Location
Malaysia
Comodity
Wind Tower Sections
Operations
Loading Attendance
Quantity | Volume | Gross Weight
60 unit | 18,226 cbm | 3,296 T
Period
28 May 2025 till 31 May 2025
Location
Indonesia
Comodity
Line Pipes
Bends and TR
Operations
Discharge Attendance
Quantity | Volume | Gross Weight
1110 unit | 4,216.89 cbm | 5,328 t
43 unit | 218 cbm | 77 t
Period
 08 Aug 2025 till 12 Aug 2025
Location
Indonesia
Comodity
Line Pipes
Pallets & Cartons
Operations
Discharge Attendance
Quantity | Volume | Gross Weight
980 unit | 3,723.02 cbm | 4,707 t
4 unit | 929.47 cbm | 8.33 t
PORT CAPTAIN SERVICES
Swire Shipping Pte Ltd
Period
13 Nov 2024 till 21 Nov 2024
Location
Bangladesh
Comodity
Dredging Equipment
Operations
Loading  Attendance
Quantity | Volume | Gross Weight
631 unit | 15,996 cbm | 4,244 t
Period
01 Dec 2024 till 11 Dec 2024
Location
Jebel Ali
Comodity
Dredging Equipment
Operations
Discharge Attendance
Quantity | Volume | Gross Weight
631 unit | 15,996 cbm | 4,244 t
Period
26 Dec 2024 till 30 Dec 2024
Location
Malaysia
Comodity
Project Cargo
Operations
Discharge Attendance
Quantity | Volume | Gross Weight
6 unit | 1,907 cbm | 287 t
Period
10 Mar 2025 till 12 Mar 2025
Location
Malaysia
Comodity
Project Cargo
Operations
Loading Attendance
Quantity | Volume | Gross Weight
5 unit | 1,150 cbm | 190 t
Period
19 Apr 2025 till 01 May 2025
Location
Bangladesh
Comodity
Land Rig
Operations
Loading Attendance
Quantity | Volume | Gross Weight
200 unit | 12,511 cbm | 3,093 t
OPERATIONS MANAGEMENT
Bertling Kazakh Logistics LLP
Period
19 Apr 2025 till 01 May 2025
Location
Tengiz, Kazakhstan
Comodity
Land Rig
Operations
Operations Management
Quantity | Volume | Gross Weight
200 unit | 12,511 cbm | 3,093 t